In cases under Article 6.1.1(b) or (c), a party must perform its obligations at one time if that performance can be rendered at one time and the circumstances do not indicate otherwise.
A party's performance is of necessity sometimes rendered at one time (e.g. delivery of a single object), or, alternatively, must take place over a period of time (e.g. construction). There are however also cases where it can be rendered either at one time or in instalments (e.g. delivery of quantities of goods). Art. 6.1.2 addresses the latter situation, in circumstances where there is no contractual provision as to how such performance should be rendered, or where it is not determinable from the contract. The principle stated is that performance is due at one time, unless the circumstances indicate otherwise.
1. A promises to deliver 100 tons of coal to B "in March". It would be materially possible and perhaps convenient for A to deliver the 100 tons in instalments, for instance 25 tons each week of the month. In principle however, according to Art. 6.1.2, A must deliver the 100 tons at one time.
2. The facts are the same as in Illustration 1, the difference being that B needs the coal gradually, to meet the needs of its operations. B also has limited storage facilities and could not cope adequately with a consignment of 100 tons at any one time. A knows of B's specific needs. Here the circumstances suggest that A should instead deliver in instalments during the month of March.
|
"Treaties": international trade instruments
Private International Commercial Law
International Commercial Arbitration & other dispute settlement
International Tax & Financial Regulation
Carriage Transport & Maritime Law
Electronic Commerce and Encryption
International Criminal Law including Anti-Corruption and Cross Border Crime
International Life Sciences & Bio-Sciences